Quality Control

About the QC
Factory Acceptance Test
FAT

-
Design Verification: Checking manuals, electrical drawings, and P&IDs against the actual build.
-
Component Certificates: Verifying material data sheets and calibration certificates for critical parts.
-
Physical Check: Inspecting the general workmanship, paint quality, and labeling of components.
-
Measurement: Verifying that the equipment dimensions match the approved layout footprint.
-
Safety Guarding: Ensuring all physical covers and protective barriers are correctly installed.
-
Punch List: Documenting any minor defects or deviations that need fixing before shipping.
-
Proprotocol Approval: Signing the official FAT report by both the manufacturer and the client.
Quality Control
QC

-
Material Inspection: Checking raw materials and parts from suppliers against specifications.
-
Certificate Verification: Reviewing vendor certificates of analysis (CoA) and material test reports.
-
Sampling Tests: Testing a representative sample from a batch before moving it to production.
-
Visual Inspection: Checking for surface defects, scratches, correct labeling, and packaging quality.
-
Dimensional Measurement: devices to verify the critical dimensions of the product.
-
Quality control after delivery and unloading, to detect any damage that may have occurred during the process.

A MODERN APPROACH COMBINED WITH YEARS OF EXPERIENCE
This is a space to ensure high quality